Progress on Septic System

The work site has finally dried out enough that work can continue on the septic system and two dormitories.  Final preparations are being made to be able to pour the concrete for the dormitories.

The septic system for the office and healthcare center are being installed and the water should be connected to the buildings soon.

You can check out pictures on the Camp Willow Springs facebook page: http://www.facebook.com/campwillowsprings .